Canadian Manufacturing

SNC-Lavalin to deliver high-tech medical manufacturing facility

by CM Staff   

Financing Manufacturing Operations Sales & Marketing Infrastructure construction In Focus Manufacturing medical manufacturing pharmaceuticals


SNC-Lavalin will provide project controls and construction management services for the Dexcom facility in Penang, Malaysia.

MONTREAL — SNC-Lavalin Group Inc. has been commissioned by US-based firm Dexcom to help deliver a major manufacturing facility in Malaysia that will produce continuous glucose monitoring systems (CGM) for diabetes management.

Under the agreement with Dexcom – the world leader in CGM technology – SNC-Lavalin will provide project controls and construction management services for the Dexcom facility in Penang, Malaysia, working with international and local consultants from concept to design, construction and commissioning.

“With more than 30 years of experience in the pharmaceutical, biotechnology and medical device market, this contract is in line with our forward strategy to continue growing our high potential core services business in Asia Pacific where we have a long history and strong presence. This project showcases the value we bring our clients, leveraging our global capabilities and local delivery across the infrastructure sector, and our strong track record serving some of the most reputable brands in the medical and healthcare sector,” said Ian L. Edwards, President and CEO, SNC-Lavalin.

“This is an important and exciting project to be part of as we help Dexcom meet growing overseas demand for its devices that bring peace of mind to those living with diabetes. The contract also adds to our portfolio of medical and healthcare projects in the region, delivered by specialist teams with a deep knowledge of the sector,” said Steve Morriss, President, Middle East, Asia Pacific, Latin America and Mining & Metallurgy.

Advertisement

The project is fast-tracked within an 18-month timeframe from construction to completion. Design is being managed and delivered just ahead of construction, which requires the SNC-Lavalin team to be flexible and adaptable while ensuring the construction program remains on track, on budget and to the expected quality standards. The facility covers an area of 29 acres and 1.75 million square feet of built-up area, hosting state-of-the-art clean-room manufacturing, a warehouse, office building, multi-level car park and utility building.

Advertisement

Stories continue below

Print this page

Related Stories